Tag
planning
2 posts.
Having a rollback plan for your VICIdial migration
A migration without a rollback plan is a bet that nothing goes wrong. Here is how to set up a credible fallback before cutover day.
Read postPlanning a zero-downtime cutover to VICIdial
A structured migration-day plan covering pre-checks, phased campaign cutover, a go/no-go checklist, and who owns the rollback decision when something goes sideways.
Read post